Concrete bag calculator
Calculate concrete bags from dimensions or a known volume and product yield. Separate modes cover dry screed consumption and placed mass.
How to use this calculator
How to measure
Measure the rectangular placement and enter the mixed yield for the exact bag size and product. Do not substitute dry bag volume. For a bagged screed mix, enter the measured area and thickness, or split the floor into rectangular rooms with a uniform thickness in each. Read the consumption unit, bag mass and product variant from its current datasheet. If referencing a datasheet, record manufacturer, product and variant, URL, document date, date read, consumption and its unit. A datasheet's thickness limits depend on the floor assembly; this calculator does not approve that assembly.
Worked example
A 1 × 1 × 0.1 m placement needs 0.1 m³. With 0.017 m³ of mixed concrete per bag, ceil(0.1 ÷ 0.017) gives 6 bags supplying 0.102 m³ of concrete.
Arithmetic example, not a thickness recommendation: 45 m² × 6 cm × 20 kg/m²/cm = 5400 kg; a chosen 5% allowance gives 5670 kg. At 25 kg per bag, buy 227 bags: 5675 kg, or 5 kg above plan. At 60 mm and 2 kg/m²/mm the result is identical.
Formula and purchasing method
net volume = length × width × thickness; planned = net × (1 + allowance/100); bags = ceil(planned ÷ mixed yield per bag). Dry mix consumption from product data: M = Σ(A × d × c); Planned dry mass = M × (1 + p/100); Whole bags to buy = ceil(Planned dry mass / Dry bag mass). d: mm ⇔ c: kg/m²/mm; d: cm ⇔ c: kg/m²/cm. Mass of placed material: M = V × ρ.
Assumptions
- For a bagged screed mix, enter the measured area and thickness, or split the floor into rectangular rooms with a uniform thickness in each. Read the consumption unit, bag mass and product variant from its current datasheet.
- Use consumption and bag mass for the exact product. kg/m²/cm and kg/m²/mm are different bases; read the unit on the datasheet. This estimates quantity, not floor design, minimum thickness, load capacity or drying time. Each room has a uniform measured thickness. The purchase allowance is applied once.
Limitations
- Water demand, mixer capacity, strength selection and curing are outside the formula.
- Actual yield can vary with mixing and placement conditions.
- Use density for the stated material condition. Loose dry powder density is not mixed yield. This mode reports volume and mass of the described placed material; it does not calculate dry bags or purchase cost.
FAQ
Can I enter bag weight instead of yield?
Bag mass alone is insufficient. Mixed-yield mode requires m³ per bag. Dry-consumption mode requires both kg/m²/mm or kg/m²/cm and dry bag mass. Placed density never implies a number of dry bags.
Why is the bag count conservative?
A fraction of a bag cannot satisfy the planned mixed volume, so it is rounded upward.
Sources
- QUIKRETE Concrete Mix technical data — packaged yield
- NIST — SI Units: Volume
- ATLAS POSTAR 20 — 2025-07-15, consumption and bag mass; read 2026-10-24
Product-specific values must be copied from the exact current label or technical datasheet; linked examples document the method and its limits.
Calculation privacy
Calculations run locally. Form inputs and results stay in your browser.
How storage works and how to delete data