Pour a concrete slab

Estimate slab volume and choose ready-mix or bag quantities.

Use measured dimensions, then add bag calculations only when that purchase method applies.

Your project workflow

Work from top to bottom. Optional steps can be skipped; alternatives are grouped into one decision.

Check completed steps. You can skip optional steps.
  1. 1

    Optional

    Check rectangular volume

    Validate measured dimensions with a general volume check.

    Use Rectangular volume calculator
  2. 2

    Step 2

    Calculate slab concrete

    Estimate concrete from the measured rectangular slab and allowance.

    Use Concrete slab calculator
  3. 3

    Optional

    Calculate bags

    Use this only when buying bagged mix with a known mixed yield.

    Use Concrete bag calculator
  4. 4

    Optional

    Estimate the purchase cost

    Use the quantity from your chosen calculator and the supplier's package price.

    Use Material purchase cost

Check thickness before choosing bags or delivery

Illustrative assumptions, not a product specification or recommended allowance. Replace them with your measurements and the selected product or system documentation.

A hypothetical 4 × 3 m slab uses 5% allowance and a bag yield of 0.02 m³. Compare measured thicknesses of 0.10 m and 0.12 m; these are quantity examples, not design thicknesses.

4 × 3 × 0.10 × 1.05 = 1.26 m³; 1.26 / 0.02 = 63

Check thickness before choosing bags or delivery
ThicknessVolume with allowanceWhole bags
0.10 m1.26 m³63
0.12 m1.512 m³76

The thicker case needs 20% more geometric volume. Its planned 1.512 m³ rounds to 76 bags, supplying 1.52 m³. Confirm the actual thickness before comparing a ready-mix quotation with bagged concrete.

Before ordering

  • Use the same dimensions and allowance in both calculators. If transferring a volume that already includes allowance, do not apply it again.
  • Obtain the exact bag yield or the supplier's delivery quantity and charges. Structural design, reinforcement, substrate and pouring sequence need separate decisions.