Multi-placement concrete volume

Sum named rectangular and circular placements, then optionally convert the order volume to whole bags using user-entered product yield.

Concrete placements

Placement 1
Shape
m
m
m
%
Product-specific bag output

Calculated result

Your result will appear here

Enter the measurements, then calculate.

Calculated in this browser.

How to use this calculator

How to measure

Split the work into placements with one consistent geometry and quantity. Names stay in the form only. Copy mixed yield only from the exact current bag label or TDS.

Worked example

Two 1 m³ placements plus one 1 m³ pad total 3 m³. A 10% allowance gives 3.3 m³. At 0.03 m³ per bag, 110 whole bags are required.

Formula and method

Sum each shape volume × whole quantity, apply one allowance, and—only in bag mode—ceil(order volume ÷ entered bag yield). Purchased and surplus yield follow the full bag count.

Assumptions

  • Placement names do not affect arithmetic or storage.
  • A supplied yield belongs to the exact selected mix.

Limitations

  • No default manufacturer yield, mix selection or structural design.
  • No pumping, batching, delivery minimum or sequence planning.

FAQ

Is a bag yield required?

Only when whole-bag mode is selected; otherwise no yield is used.

Are placement names saved?

No. Recent stores only calculator metadata.

Sources

A linked manufacturer document is contextual for that product/system only. Current product yield, spacing and density must come from the exact item selected by the user.

Calculation privacy

Calculations run locally. Form inputs and results stay in your browser.

How storage works and how to delete data

Related guides

Related calculators